1993 Donruss LONG BALL LEADERS - Complete Set (10 cards)

Bonds, Griffey, Frank Thomas, Bo Jackson, Piazza ...
Grade
NM/MINT
Book Value
n/a
Our Price
$ 18.95
Add to cart

1993 Donruss LONG BALL LEADERS - Complete Set (10 cards)  cards value
Baseball
Below are short bits & pieces on sportscard & baseball trading card collecting.
Please wander around the website for more info, prices, values & images
on vintage baseball, football, basketball, hockey, sport and non-sports cards.

1969 CITGO Coins

1969 Citgo Coin banner
In 1969, to commemorate Baseball's 100th Anniversary, CITGO released their "Famous Baseball Player Coin Collection" of 20 brass coated metal coins. On the front, the coins featured the player's name and a raised image of his head. The back displayed a banner honoring baseball's s 100th Anniversary. The coins are approx. 1" in diameter and are very susceptible to tarnishing due to oxidation.

Customers received a single coin in it's sealed pack free with a fill-up and could pay 25 cents for additional coins. The 20 coin set could be inserted into a cardboard backing for display. On the back of the display was a short bio with stats of each player. Click to view an image of the cardboard backing and some more sample coins:

1969 Citgo Coin front Pictured is an unopened pack containing one coin.

Click for complete 1969 CITGO Coins Checklist and Prices
Note: You may be on that page right now.

Baseball

1954 Topps Scoops


1954 Topps Scoops 1954 Topps Scoops squeezes 1,000 years of history into a sharp (156) card set. The cards, slightly smaller 2-1/16" x 2-15/16", were released in (2) (78) card series. Each card had a colorful painting and caption with date on front. Some were issued with a scratch-off area meant hiding the headline so some cards are found with and without the coating. 1954 Topps Scoops Coated 1954 Scoops covered many major events & people throughout history. Mostly a non-sports set, many top sports stars like Babe Ruth, Jesse Owens, Notre Dame's Four Horsemen, Joe Louis, Bob Feller and Ben Hogan were included. 1954 Topps Scoops Pack
1954 Topps Scoops Ruth Backs are similar to a newspaper's front page with newspaper's name, headline, date & location at top. The set seemed to focus on disasters like the San Francisco Earthquake, Fire Sweeps Chicago, Rome Burned, Pompeii Destroyed (#91); and wars: Battleship Maine Blown Up, Alamo Falls, U.S. Troops Reach France, World War II Begins, Victory in Europe & Napoleon Loses at Waterloo plus many other events that shaped the world.

Click for complete 1954 Topps Scoops
Note: You may be on that page right now.

Baseball

1973 O-Pee-Chee (OPC) Baseball
Checklist & Values



Click for complete 1973 O-Pee-Chee (OPC) Baseball checklist, values and prices.
Note: You may be on that page right now.

Baseball
Baseball card collecting terms (part B)

Bazooka Bazooka Bubble Gum put baseball cards on the back of their boxes from 1959 thru 1971. Complete boxes and panels can get extremely costly. Most kids back then could not afford complete boxes of bubble gum at one making Bazooka cards quite scarce. I actually don't recall ever obtaining a Bazooka card directly from a box as a kid. Do you ???

Black Sox Scandal Name given to the the most famous scandal in baseball history after the 1919 Chicago White Sox versus the Cincinatti Reds World Series when 8 White Sox players were accused of throwing the series. Details have remained somewhat unclear. The players were acquitted of criminal charges but 8 players still received a lifetime ban from professional baseball including the All-Time great "Shoeless" Joe Jackson.

Blank-Back a card in which nothing is printed on the back. These cards are usually not in packs and are either "PROOF ISSUES" or were removed from the factory in some way.

Blanket a term used for collectibles in the 1910's made of fabric .

Border is the part of the card that surrounds the photo or image.

Bowman was a card manufacturer in the 1940's and 1950's that was bought out by Topps. In 1989 Topps started issuing cards using the Bowman brand.

Break a term used to indicate the opening of a set, pack, box or case.

Break Value is the total book value of each card added up individually. The break value of a set is usually way, way more than the value of the complete set.

Go back to the Goto top of Vintage Cards
© 1995-2025 www.Baseball-Cards.com / Joseph Juhasz ... All Rights Reserved